Bring your office layout, existing-site condition and occupation date into one defined execution scope. Roy Constructions offers design and execution or construction against your appointed designer’s drawings, with work packages, decisions and specialist interfaces agreed before site work.

Define what the business needs to operate

Start with the team, equipment and working pattern. Identify workstations, cabins, meeting rooms, reception, storage and support functions. Review furniture positions alongside lighting, power, data and required privacy. The advertised area alone cannot establish a suitable capacity or a complete fit-out budget.

Establish the landlord and tenant responsibilities

Ask what the premises includes and what the tenant must provide. Existing air-conditioning, electrical distribution or visible data points should be assessed for the proposed use by the relevant professionals. Do not assume that a system’s presence establishes its condition or suitability.

For each building, confirm the applicable working hours, access arrangements, deliveries, debris movement, protection and submissions. Record who obtains the necessary permissions and any separately payable charges. This page does not assert that all Sector V buildings have identical requirements.

Coordinate the systems before closing the finishes

Electrical and backup

Business requirements, equipment inputs, point schedule and appointed responsibilities

Data and IT

Outlet locations, vendor drawings, service routes and equipment positions

Air-conditioning

Landlord provisions, separately agreed AC scope and access/drainage/power interfaces

Fire and building systems

Required specialist information, interfaces and building-management coordination

Ceilings and lighting

Agreed levels, fixture positions, service coordination and maintenance access

Furniture and storage

Approved dimensions, final service positions, specification and delivery sequence

The proposal identifies which packages Roy Constructions executes and which are supplied or appointed separately. Technical coordination does not automatically mean every system is included. Appliances and statutory approvals remain outside the standard interior appointment; any approval assistance must be agreed separately.

Compare a complete scope

Review preparation, partitions, doors, flooring, ceilings, painting, electrical work and furniture as separate priced packages where relevant. Each needs a measurement basis, quantity, specification and inclusion boundary. Unresolved selections should be identified rather than disguised as a fixed complete-interior amount.

A business considering an occupied-office renovation should also discuss phasing, protection and operational restrictions. A programme for a vacant floor cannot automatically be used for work around an operating team.

Plan from approved information to handover

Agree which drawings are released for construction, which materials need approval and which decisions affect procurement. Identify the owner of each client or vendor input and the consequence of a late change. At handover, review the agreed works, specialist records and outstanding-item closure process.

Roy Constructions’ current Bhubaneswar office appointment has a planned 45-calendar-day programme. It is an example tied to that project’s scope, not a standard promise for Salt Lake offices. Your quotation and programme must reflect your premises and appointments.

Check experience against the package you are appointing

Roy Constructions was established in 2017 and has published retail project references as well as current commercial execution work. Review comparable drawings, project photographs and scope records where permission permits. A client name or finished photograph should be accompanied by an explanation of Roy Constructions’ actual role.

The ongoing Bhubaneswar office example is approximately 2,000 sq.ft of carpet area at ₹18 lakh including GST, for interior execution and design consultation. Confirmed packages include 16 mm cement-board partitions, installation of three doors, walls/ceiling painting and electrical work within the agreed scope. Keep this city and ongoing status explicit in any reference.

Common appointment questions

Do we need a complete design before speaking to Roy Constructions? No. Share the available plans and business brief. We can establish the appropriate design, consultation or execution appointment; detailed services are scoped before work begins.

Can you coordinate with our IT and specialist vendors? Coordination responsibilities can be agreed in the proposal. Identify each vendor’s drawings, inputs, supply boundaries and required site access early.

What should we send first? The Salt Lake/Sector V address, floor plan, area basis, existing condition, intended use/headcount, budget and occupation date. Include any landlord requirements already available.

What happens next? We aim to respond within 12 hours and agree the next step. One initial consultation site visit is complimentary; detailed survey, feasibility and design work are separate agreed services.

Retail execution experience: Zudio, Alcove Mall, Kolkata.

Retail execution experience: Zudio, Alcove Mall, Kolkata.

Tell us about your project

Five details to start a conversation.

We use these details to review your project and contact you. Detailed design and site assessments are agreed separately.